Paul Bunyan Trail Tour: Winter Edition
Posted by Emma Gruber on
The Paul Bunyan State Trail: Connecting the Brainerd Lakes Area + beyond.
History
The first 50 miles of this multi-use, recreational trail from Brainerd/Baxter to Hackensack, MN was paved with asphalt and opened in October 1983. The trail pathway follows the original railroad line built in 1893 by Burlington Northern and is now among the longest paved trails in the nation at approximately 115 miles.
Popular Activities on the Trail
-
Biking
-
E-Biking
-
Rollerblading
-
Hiking/walking
-
Snowshoeing
-
Cross Country Ski
-
Snowmobiling
Trail Towns
-
Brainerd
-
Baxter
-
Merrifield
-
Nisswa
-
Pequot Lakes
-
Jenkins
-
Pine…
612 Views, 0 Comments